You need to know how thick the pad is going to be so that you can convert it into cubic yards of concrete. Other variables include, site preparation, amount of fill, amount of re-bar, grade of pour, and type of finish. A fairly good method is to take total cost of materials in the job and add 10% and you should come up with a fairly reasonable rate for labor. Ewww, concrete work is no fun. Good Luck! J